{"id":143741,"date":"2024-04-05T07:56:52","date_gmt":"2024-04-05T14:56:52","guid":{"rendered":"https:\/\/clickup.com\/blog\/?p=143741"},"modified":"2024-04-05T07:56:53","modified_gmt":"2024-04-05T14:56:53","slug":"takt-time","status":"publish","type":"post","link":"https:\/\/clickup.com\/blog\/takt-time\/","title":{"rendered":"How to Calculate Takt Time to Meet Customer Demand"},"content":{"rendered":"\n<p>In lean manufacturing, there is a rhythm, a beat, that guides the production processes. This rhythm\u2014measured in Takt Time\u2014is the heartbeat of factories worldwide.&nbsp;<\/p>\n\n\n\n<p>In this blog post, we explore Takt time and how to use it to strengthen your manufacturing processes.<\/p>\n\n\n<div class=\"wp-block-ub-table-of-contents-block ub_table-of-contents\" id=\"ub_table-of-contents-cc4e34a1-589f-422f-ab77-2e91be693b6d\" data-linktodivider=\"false\" data-showtext=\"show\" data-hidetext=\"hide\" data-scrolltype=\"auto\" data-enablesmoothscroll=\"false\" data-initiallyhideonmobile=\"false\" data-initiallyshow=\"true\"><div class=\"ub_table-of-contents-header-container\" style=\"\">\n\t\t\t<div class=\"ub_table-of-contents-header\" style=\"text-align: left; \">\n\t\t\t\t<div class=\"ub_table-of-contents-title\">How to Calculate Takt Time to Meet Customer Demand<\/div>\n\t\t\t\t\n\t\t\t<\/div>\n\t\t<\/div><div class=\"ub_table-of-contents-extra-container\" style=\"\">\n\t\t\t<div class=\"ub_table-of-contents-container ub_table-of-contents-1-column \">\n\t\t\t\t<ul style=\"\"><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#0-what-is-takt-time\" style=\"\">What is Takt Time?<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#1-how-to-calculate-takt-time\" style=\"\">How to Calculate Takt Time?<\/a><ul><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#2-step-1-determine-customer-demand\" style=\"\">Step 1: Determine customer demand<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#3-step-2-calculate-your-available-production-time\" style=\"\">Step 2: Calculate your available production time<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#4-step-3-apply-the-takt-time-formula\" style=\"\">Step 3: Apply the Takt time formula<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#5-takt-time-in-relation-to-other-time-metrics\" style=\"\">Takt time in relation to other time metrics<\/a><\/li><\/ul><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#9-benefits-and-limitations-of-takt-time\" style=\"\">Benefits and Limitations of Takt Time<\/a><ul><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#10-benefits-of-takt-time\" style=\"\">Benefits of Takt time<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#11-limitations-of-takt-time\" style=\"\">Limitations of Takt time<\/a><\/li><\/ul><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#12-implementing-takt-time-in-projects\" style=\"\">Implementing Takt Time in Projects<\/a><ul><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#13-step-1-understand-the-rhythm-of-your-customer-demand\" style=\"\">Step 1: Understand the rhythm of your customer demand<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#14-step-2-track-availability-across-processes\" style=\"\">Step 2: Track availability across processes<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#15-step-3-calculate-takt-time\" style=\"\">Step 3: Calculate Takt time<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#16-step-4-identify-bottlenecks-and-optimize-performance\" style=\"\">Step 4: Identify bottlenecks and optimize performance<\/a><\/li><\/ul><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#18-faqs-about-takt-time\" style=\"\">FAQs About Takt Time<\/a><ul><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#19-1-what-is-the-difference-between-takt-time-and-cycle-time\" style=\"\">1. What is the difference between Takt time and cycle time?<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#20-2-what-is-the-formula-for-calculating-takt-time\" style=\"\">2. What is the formula for calculating takt time?<\/a><\/li><li style=\"\"><a href=\"https:\/\/clickup.com\/blog\/takt-time\/#21-3-what-is-tach-time-in-production\" style=\"\">3. What is tach time in production?<\/a><\/li><\/ul><\/li><\/ul>\n\t\t\t<\/div>\n\t\t<\/div><\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"0-what-is-takt-time\">What is Takt Time?<\/h2>\n\n\n\n<p>Takt time is the rate at which you should produce goods to fulfill customer demand without overproducing or underproducing.<\/p>\n\n\n\n<p>Originating in the 1930s with the German aircraft industry, the word \u201cTakt\u201d means \u2018rhythm\u2019 or \u2018beat.\u2019 Since then, the metric has been adopted by several manufacturing organizations after being popularized by the Toyota production system.&nbsp;<\/p>\n\n\n\n<p>In the lean production system, Takt time is a simple concept that keeps the production line in harmony with customer needs, ensuring all stakeholders are satisfied.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-how-to-calculate-takt-time\">How to Calculate Takt Time?<\/h2>\n\n\n\n<p>The formula for Takt time is Takt time = Available production time\/customer demand.&nbsp;<\/p>\n\n\n\n<p>You divide how much time you can spend making the product by how many products you need to make. You can adjust any of the three variables to optimize business outcomes.<\/p>\n\n\n\n<p>Let\u2019s look at an example. Let\u2019s say you run a quaint bakery in the heart of Paris. You, the baker, must know precisely how often you must prepare a croissant to satisfy the morning rush without overburdening the ovens or wasting resources. Here\u2019s how you\u2019d do that.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"2-step-1-determine-customer-demand\">Step 1: Determine customer demand<\/h3>\n\n\n\n<p>Customer demand is the external factor you have little control over. So, begin there. Understand how many croissants your customers need at what times of the day.&nbsp;<\/p>\n\n\n\n<p>For instance, breakfast and tea time might be more of a rush for croissants than lunch or dinner. On the other hand, if you\u2019re running a bicycle manufacturing business, your demand might be higher in summer than when it snows. As a business owner\/manager, you\u2019re in the best place to measure this.<\/p>\n\n\n\n<p>So, determine your customer demand in the number of units you need to produce. Let\u2019s say your customer demand is 1120 croissants.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"3-step-2-calculate-your-available-production-time\">Step 2: Calculate your available production time<\/h3>\n\n\n\n<p>Available production time is in your control, depending on your capacity, machinery, team size, etc. To track the granular details of how much each process is taking or what the productivity of each employee is, try a <a href=\"https:\/\/clickup.com\/blog\/time-tracking-software-small-businesses\/\">time tracking software for small businesses<\/a>.&nbsp;<\/p>\n\n\n\n<p>For now, let\u2019s take a simple example. If your team is one person working 8 hours a day, 5 days a week, and takes an hour off each day for breaks\/meetings, you have 35 hours available each week.<\/p>\n\n\n\n<p>(1 baker * 8 hours * 5 days) &#8211; (1 hour * 5 days)<\/p>\n\n\n\n<p>If you have four bakers equally sharing two 8-hour shifts, all seven days, without a break, you have 224 hours available each week.<\/p>\n\n\n\n<p>(8 hours * 7 days * 4 bakers)<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"4-step-3-apply-the-takt-time-formula\">Step 3: Apply the Takt time formula<\/h3>\n\n\n\n<p><strong>Takt time = Available production time\/Customer demand<\/strong><\/p>\n\n\n\n<p>In this example, the Takt time of your croissant&#8217;s bakery is 224\/1120 = 0.2 or 1\/5th of an hour.<\/p>\n\n\n\n<p>This means that if you prepare a croissant in 12 minutes, you will effectively satisfy customer demand. Knowing this will help your bakers plan their time. If it\u2019s impossible to knead the dough, make the bun, and bake it, too, you\u2019ll either settle for not meeting customer demand or hire more bakers!<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"5-takt-time-in-relation-to-other-time-metrics\">Takt time in relation to other time metrics<\/h3>\n\n\n\n<p>If you\u2019ve worked in manufacturing, you&#8217;ve heard about a bunch of time-related metrics, such as lead time, touch time, cycle time, etc. In project time management, these metrics interlock with each other. But how do they relate to Takt time? Let\u2019s find out.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lead time<\/strong>: Time from when an order is placed until it&#8217;s delivered<\/li>\n\n\n\n<li><strong>Touch time<\/strong>: Time workers are touching the product, i.e., adding value<\/li>\n\n\n\n<li><strong>Cycle time<\/strong>: Time it takes to complete one cycle of production from start to finish<\/li>\n<\/ul>\n\n\n\n<p>Let\u2019s go back to the example of croissants.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"6-lead-time-\"><strong>Lead time<\/strong><\/h4>\n\n\n\n<p>Lead time is the time between when a customer orders a croissant and receiving it. In this case, the croissants are prepared in advance and kept ready for orders, so the lead time might be a matter of seconds. However, the lead time might be much longer if you make custom cakes in the same bakery.<\/p>\n\n\n\n<p>The key difference between lead and Takt time is that the former includes paperwork, processing, packaging, etc., while the latter is typically just the production time.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"7-touch-time-\"><strong>Touch time<\/strong><\/h4>\n\n\n\n<p>Touch time is from when the baker receives the raw materials to when they pile the batch of croissants on the tray. Any <a href=\"https:\/\/clickup.com\/blog\/time-management-tools\/\">time management tool<\/a> you use for your business will easily capture this information.<\/p>\n\n\n\n<p>Touch time is only that part of the production process when the team\/machinery is actively working on it\u2014i.e., the value creation process. Takt time includes all the waiting and moving time as well.&nbsp;<\/p>\n\n\n\n<p>For instance, if the baker needs 10 minutes to prepare the dough but has to wait 10 minutes for the kitchen table to be ready to use, the Takt time is 20 minutes, but the Touch time is 10 minutes.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"8-cycle-time-\"><strong>Cycle time<\/strong><\/h4>\n\n\n\n<p>Cycle time is the average time bakers take to produce the croissants.&nbsp;<\/p>\n\n\n\n<p>Cycle time = Available production time\/actual units of production&nbsp;<\/p>\n\n\n\n<p>Takt time compares capacity to demand, while cycle time compares capacity to actuals.<\/p>\n\n\n\n<p>If that sounds like too many metrics to calculate, here\u2019s why you should pay attention to Takt time.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9-benefits-and-limitations-of-takt-time\">Benefits and Limitations of Takt Time<\/h2>\n\n\n\n<p>Takt time acts as a guideline for what you need to complete in the time you have to meet market demand. This can apply far beyond manufacturing.&nbsp;<\/p>\n\n\n\n<p>If you\u2019re a content writer working 8 hours a day, and the demand for your service is 2 articles a day, you need to write one article every 4 hours, which is your Takt time.&nbsp;<\/p>\n\n\n\n<p>If you\u2019re in construction and get commissions to build two houses each year, your Takt time is 6 months. A good <a href=\"https:\/\/clickup.com\/blog\/construction-time-tracking-software\/\">construction time tracking software<\/a> should tell you if your work can be completed in that time with the given capacity.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"910\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-construction-management-and-time-tracking.png\" alt=\"ClickUp construction management and time tracking\" class=\"wp-image-143756\" srcset=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-construction-management-and-time-tracking.png 1200w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-construction-management-and-time-tracking-300x228.png 300w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-construction-management-and-time-tracking-768x582.png 768w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-construction-management-and-time-tracking-700x531.png 700w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Construction management and time tracking with ClickUp<\/figcaption><\/figure><\/div>\n\n\n<p>Takt time helps businesses understand when, how much, and how often to produce. Here\u2019s how that helps.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"10-benefits-of-takt-time\">Benefits of Takt time<\/h3>\n\n\n\n<p><strong>Aligning production to demand<\/strong>: Aligning your output to customer demand will prevent over- or under-production.<\/p>\n\n\n\n<p><strong>Eliminating wastage<\/strong>: Takt time considers the maximum number of units you can sell in any given time period. With this knowledge, you can eliminate wastage by producing the correct number, ordering the right amount of raw materials, employing the precise number of people, and so on.<\/p>\n\n\n\n<p><strong>Improving predictability<\/strong>: Customer demand acts as an anchor for the production process. It helps predict how much you can sell and how much raw materials\/team capacity\/machine time you need. This ensures you identify and mitigate risks in advance.<\/p>\n\n\n\n<p><strong>Improvement of productivity<\/strong>: Takt time tells you exactly how productive you need to be to maximize revenue. This helps business leaders and facility managers optimize their resources.&nbsp;<\/p>\n\n\n\n<p>For instance, if one baker can not make 280 croissants in a day, they are unproductive and need some form of intervention.&nbsp;<\/p>\n\n\n\n<p>If you\u2019re a software engineering team, use <a href=\"https:\/\/clickup.com\/blog\/time-tracking-software-developers\/\">time tracking software for developers<\/a> to identify Takt time and allocate resources more optimally to achieve Takt time.<\/p>\n\n\n\n<p><strong>Enhancing quality assurance<\/strong>: Takt time tends to be tight, so production managers must set clear quality assurance standards. It helps operationalize production so quality standards are held.<\/p>\n\n\n\n<p><strong>Optimization of program performance<\/strong>: Takt time helps harmonize various production elements, from inventory levels and workforce allocation to <a href=\"https:\/\/clickup.com\/blog\/resource-scheduling\/\">resource scheduling<\/a>.&nbsp;<\/p>\n\n\n\n<p>As with every metric, Takt time also has some limitations. Let\u2019s explore them.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"11-limitations-of-takt-time\">Limitations of Takt time<\/h3>\n\n\n\n<p><strong>Rigidity in dynamic markets<\/strong>: In industries where customer demand can change as quickly as the weather, the rigidity of Takt time can become a limitation. It&#8217;s like planning a picnic weeks in advance, only to have it rain. Without the flexibility to adjust swiftly, the system can struggle.<\/p>\n\n\n\n<p><strong>Overemphasis on uniformity<\/strong>: Takt time assumes a certain uniformity by considering average demand and average production time. In reality, demand is rarely stable.<\/p>\n\n\n\n<p><strong>Assuming control<\/strong>: Takt time assumes that several factors, such as employee availability, machinery uptime, etc., can be controlled, which is often not the case.<\/p>\n\n\n\n<p>Despite its limitations, Takt time is a great tool for optimizing production across industries, products, and services. Here are some practical steps for implementing Takt time correctly.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12-implementing-takt-time-in-projects\">Implementing Takt Time in Projects<\/h2>\n\n\n\n<p>Implementing Takt time in projects can turn chaotic workflows into efficient ones, but it does require careful orchestration and robust <a href=\"https:\/\/clickup.com\/teams\/product\">product management software like ClickUp<\/a>. Consider the following step-by-step guide to help you on your implementation journey.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"13-step-1-understand-the-rhythm-of-your-customer-demand\">Step 1: Understand the rhythm of your customer demand<\/h3>\n\n\n\n<p>Customer demand is rarely uniform. You need to understand its ebbs and flows to gauge and project demand. If you\u2019re using ClickUp as your production management tool, you can see the trends visually.<\/p>\n\n\n\n<p><a href=\"https:\/\/clickup.com\/features\/dashboards\"><strong>ClickUp Dashboard<\/strong><\/a> can be customized to visualize sales, order activity, revenue trends, and more. You can also compare this against goals and KPIs.<\/p>\n\n\n\n<figure class=\"wp-block-video aligncenter\"><video autoplay controls loop muted src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Dashboard-1.mp4\" playsinline><\/video><figcaption class=\"wp-element-caption\"><em>ClickUp Dashboard for real-time reporting<\/em><\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"14-step-2-track-availability-across-processes\">Step 2: Track availability across processes<\/h3>\n\n\n\n<p>Calculating \u2018available production time\u2019 includes tracking a number of things, such as:<\/p>\n\n\n\n<p><strong>Machinery availability<\/strong>: If you\u2019re on a shared production line, you need information about when the machinery is available.<\/p>\n\n\n\n<p><strong>Team availability<\/strong>: What work do your employees currently have, and when are they available? ClickUp time tracking enables team members to track their work at a granular level. The workload view gives you a big picture of this metric across all team members.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"988\" height=\"690\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/01\/ClickUp-Time-tracking.gif\" alt=\"ClickUp-Time-tracking\" class=\"wp-image-133236\"\/><figcaption class=\"wp-element-caption\">Accurate time tracking for every task with ClickUp<\/figcaption><\/figure><\/div>\n\n\n<p><strong>Material availability<\/strong>: When does your raw material come in? If your team is available before raw materials are here, you\u2019ll waste their time. To map such dependencies effectively, the <a href=\"https:\/\/clickup.com\/features\/gantt-chart-view\">ClickUp Gantt chart view<\/a> is ideal.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"797\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/image-197.png\" alt=\"ClickUp\u2019s Gantt charts\u00a0\" class=\"wp-image-137865\" srcset=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/image-197.png 1200w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/image-197-300x199.png 300w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/image-197-768x510.png 768w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/image-197-700x465.png 700w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\"><em>ClickUp Gantt chart view to map dependencies<\/em><\/figcaption><\/figure><\/div>\n\n\n<p>You can use a <a href=\"https:\/\/clickup.com\/blog\/daily-planner-apps\/\">daily planner app<\/a> to track all these metrics and calculate your available production time. These <a href=\"https:\/\/clickup.com\/blog\/time-log-templates\/\">time log templates<\/a> can also help bring all information together to make informed decisions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"15-step-3-calculate-takt-time\">Step 3: Calculate Takt time<\/h3>\n\n\n\n<p>Takt time is available production time divided by customer demand. Use the ClickUp Formula Fields to calculate Takt time. Add progress against goals to the dashboard.<\/p>\n\n\n\n<p>Schedule your project to achieve your Takt time. Always keep an eye on how you\u2019re performing against customer demand.<\/p>\n\n\n\n<p>If you\u2019re new to project management, here are some <a href=\"https:\/\/clickup.com\/blog\/project-schedule-templates\/\">ClickUp project schedule templates<\/a> to get you started.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"960\" height=\"498\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/11\/simple-formula.gif\" alt=\"Formulas in ClickUp Custom Fields\" class=\"wp-image-46280\"\/><figcaption class=\"wp-element-caption\">Calculate Takt time effortlessly with ClickUp&#8217;s custom formula fields<\/figcaption><\/figure><\/div>\n\n\n<h3 class=\"wp-block-heading\" id=\"16-step-4-identify-bottlenecks-and-optimize-performance\">Step 4: Identify bottlenecks and optimize performance<\/h3>\n\n\n\n<p>The thing about Takt time is that you won\u2019t meet all demand. For instance, instead of 1120, if the customer demand for croissants is 5,000, your Takt time is 2.4 minutes, which is nearly impossible to achieve.<\/p>\n\n\n\n<p>The goal of Takt time is not to force yourself to achieve it but to use it to optimize your performance. So, if your demand increases, you can:<\/p>\n\n\n\n<p><strong>Accept your situation<\/strong>: Settle for meeting only a part of the customer demand you can. While this keeps the business steady, it also leaves a significant opportunity out.<\/p>\n\n\n\n<p><strong>Increase capacity<\/strong>: Invest in additional machinery or people capacity to increase production time. For instance, if the mixer takes too long to prepare the dough, you can identify that as a bottleneck and replace the mixer.&nbsp;<\/p>\n\n\n\n<p><strong>Redesign product<\/strong>: If the current product takes too long, you can redesign it without affecting customer experience. For instance, you can reduce the size of the croissant to make more units with the same raw material.<\/p>\n\n\n\n<p><strong>Automate<\/strong>: Assembly lines are a perfect example of automation. If you\u2019re not ready to set up an assembly line in your bakery, try simple automation for billing, purchases, etc.<\/p>\n\n\n\n<p><a href=\"https:\/\/clickup.com\/features\/automations\">ClickUp Automations<\/a> offers 100+ templates for streamlining workflows, routine tasks, project handoffs, and more.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"728\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Task-Creation-Automation.png\" alt=\"ClickUp Task Creation Automation\" class=\"wp-image-143762\" srcset=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Task-Creation-Automation.png 1200w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Task-Creation-Automation-300x182.png 300w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Task-Creation-Automation-768x466.png 768w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/ClickUp-Task-Creation-Automation-700x425.png 700w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption class=\"wp-element-caption\">Task creation automations on ClickUp<\/figcaption><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"17-achieve-your-takt-time-goals-with-clickup\">Achieve Your Takt Time Goals With ClickUp<\/h2>\n\n\n\n<p>Takt time is a great metric far beyond manufacturing. It&#8217;s a fundamental rhythm that can orchestrate success across various industries, from the bustling floors of factories to the dynamic software development spaces. It helps synchronize the market with your capacity.&nbsp;<\/p>\n\n\n\n<p><a href=\"https:\/\/clickup.com\/teams\/project-management\">ClickUp project management tool<\/a> helps observe, track, measure, and achieve Takt time goals. With features for time tracking, reporting, dashboards, and calculations, ClickUp powers lean management processes effectively.&nbsp;<\/p>\n\n\n\n<p>Whether you\u2019re in the construction business or software development, ClickUp\u2019s operations management capabilities power efficiency and productivity. Experience it for yourself.<\/p>\n\n\n\n<div class=\"wp-block-cu-buttons\"><a href=\"https:\/\/clickup.com\/signup\" class=\"cu-button cu-button--purple cu-button--improved\">Try ClickUp for free today!<\/a><\/div>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"18-faqs-about-takt-time\">FAQs About Takt Time<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"19-1-what-is-the-difference-between-takt-time-and-cycle-time\">1. What is the difference between Takt time and cycle time?<\/h3>\n\n\n\n<p>Cycle time is the average time it currently takes to produce the completed product. Takt time is the rate at which you should produce goods to fulfill customer demand.<\/p>\n\n\n\n<p>Takt time compares capacity to demand, while cycle time compares capacity to actuals.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Cycle time = Available production time\/actual units of production&nbsp;<\/li>\n\n\n\n<li>Takt time = Available production time\/customer demand<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"20-2-what-is-the-formula-for-calculating-takt-time\">2. What is the formula for calculating takt time?<\/h3>\n\n\n\n<p>Takt Time = Available production time\/Customer demand<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"21-3-what-is-tach-time-in-production\">3. What is tach time in production?<\/h3>\n\n\n\n<p>Tach time is an aeronautical term for measuring the strain an aircraft engine has endured. It is often confused with Takt time, which is a manufacturing term.<\/p>\n\n\n\n<p>Takt time is the ideal production rate to fulfill customer demand without over\/under-producing.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In lean manufacturing, there is a rhythm, a beat, that guides the production processes. This rhythm\u2014measured in Takt Time\u2014is the heartbeat of factories worldwide.&nbsp; In this blog post, we explore Takt time and how to use it to strengthen your manufacturing processes. What is Takt Time? Takt time is the rate at which you should [&hellip;]<\/p>\n","protected":false},"author":122,"featured_media":143770,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ub_ctt_via":"","cu_sticky_sidebar_cta_is_visible":true,"cu_sticky_sidebar_cta_title":"Start using ClickUp today","cu_sticky_sidebar_cta_bullet_1":"Manage all your work in one place","cu_sticky_sidebar_cta_bullet_2":"Collaborate with your team","cu_sticky_sidebar_cta_bullet_3":"Use ClickUp for FREE\u2014forever","cu_sticky_sidebar_cta_button_text":"Get Started","cu_sticky_sidebar_cta_button_link":"","_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[989,757],"tags":[],"class_list":["post-143741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-time-management"],"featured_image_src":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","author_info":{"display_name":"PMO Team","author_link":"https:\/\/clickup.com\/blog\/author\/pmo\/"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How to Calculate Takt Time to Meet Customer Demand<\/title>\n<meta name=\"description\" content=\"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clickup.com\/blog\/takt-time\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to Calculate Takt Time to Meet Customer Demand\" \/>\n<meta property=\"og:description\" content=\"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clickup.com\/blog\/takt-time\/\" \/>\n<meta property=\"og:site_name\" content=\"The ClickUp Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/clickupprojectmanagement\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-05T14:56:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-04-05T14:56:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"1050\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"PMO Team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@clickup\" \/>\n<meta name=\"twitter:site\" content=\"@clickup\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"PMO Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/\"},\"author\":{\"name\":\"PMO Team\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/f9308b24515b8b65f265dbfac8e00946\"},\"headline\":\"How to Calculate Takt Time to Meet Customer Demand\",\"datePublished\":\"2024-04-05T14:56:52+00:00\",\"dateModified\":\"2024-04-05T14:56:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/\"},\"wordCount\":2222,\"publisher\":{\"@id\":\"https:\/\/clickup.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png\",\"articleSection\":[\"Construction\",\"Time Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/\",\"url\":\"https:\/\/clickup.com\/blog\/takt-time\/\",\"name\":\"How to Calculate Takt Time to Meet Customer Demand\",\"isPartOf\":{\"@id\":\"https:\/\/clickup.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png\",\"datePublished\":\"2024-04-05T14:56:52+00:00\",\"dateModified\":\"2024-04-05T14:56:53+00:00\",\"description\":\"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.\",\"breadcrumb\":{\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/clickup.com\/blog\/takt-time\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage\",\"url\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png\",\"contentUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png\",\"width\":1400,\"height\":1050,\"caption\":\"Takt Time Blog Feature\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/clickup.com\/blog\/takt-time\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/clickup.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Time Management\",\"item\":\"https:\/\/clickup.com\/blog\/time-management\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"How to Calculate Takt Time to Meet Customer Demand\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/clickup.com\/blog\/#website\",\"url\":\"https:\/\/clickup.com\/blog\/\",\"name\":\"The ClickUp Blog\",\"description\":\"The ClickUp Blog\",\"publisher\":{\"@id\":\"https:\/\/clickup.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/clickup.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/clickup.com\/blog\/#organization\",\"name\":\"ClickUp\",\"url\":\"https:\/\/clickup.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg\",\"contentUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg\",\"width\":503,\"height\":125,\"caption\":\"ClickUp\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/clickupprojectmanagement\",\"https:\/\/x.com\/clickup\",\"https:\/\/www.linkedin.com\/company\/clickup-app\",\"https:\/\/en.wikipedia.org\/wiki\/ClickUp\",\"https:\/\/tiktok.com\/@clickup\",\"https:\/\/instagram.com\/clickup\",\"https:\/\/www.youtube.com\/@ClickUpProductivity\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/f9308b24515b8b65f265dbfac8e00946\",\"name\":\"PMO Team\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7cc32635567ff78e2d7dfea37c0f5051c158878c1820337a893b8483802dc579?s=96&d=retro&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7cc32635567ff78e2d7dfea37c0f5051c158878c1820337a893b8483802dc579?s=96&d=retro&r=g\",\"caption\":\"PMO Team\"},\"description\":\"The driving force of the company, this group is responsible for moving the needle across various projects at ClickUp. They double up as storytellers to share project management tips and tricks with the larger community.\",\"url\":\"https:\/\/clickup.com\/blog\/author\/pmo\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to Calculate Takt Time to Meet Customer Demand","description":"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clickup.com\/blog\/takt-time\/","og_locale":"en_US","og_type":"article","og_title":"How to Calculate Takt Time to Meet Customer Demand","og_description":"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.","og_url":"https:\/\/clickup.com\/blog\/takt-time\/","og_site_name":"The ClickUp Blog","article_publisher":"https:\/\/www.facebook.com\/clickupprojectmanagement","article_published_time":"2024-04-05T14:56:52+00:00","article_modified_time":"2024-04-05T14:56:53+00:00","og_image":[{"width":1400,"height":1050,"url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","type":"image\/png"}],"author":"PMO Team","twitter_card":"summary_large_image","twitter_creator":"@clickup","twitter_site":"@clickup","twitter_misc":{"Written by":"PMO Team","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/clickup.com\/blog\/takt-time\/#article","isPartOf":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/"},"author":{"name":"PMO Team","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/f9308b24515b8b65f265dbfac8e00946"},"headline":"How to Calculate Takt Time to Meet Customer Demand","datePublished":"2024-04-05T14:56:52+00:00","dateModified":"2024-04-05T14:56:53+00:00","mainEntityOfPage":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/"},"wordCount":2222,"publisher":{"@id":"https:\/\/clickup.com\/blog\/#organization"},"image":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage"},"thumbnailUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","articleSection":["Construction","Time Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/clickup.com\/blog\/takt-time\/","url":"https:\/\/clickup.com\/blog\/takt-time\/","name":"How to Calculate Takt Time to Meet Customer Demand","isPartOf":{"@id":"https:\/\/clickup.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage"},"image":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage"},"thumbnailUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","datePublished":"2024-04-05T14:56:52+00:00","dateModified":"2024-04-05T14:56:53+00:00","description":"Check out the benefits and limitations of Takt time in your businesses. Explore the various ways of implementing it in your projects.","breadcrumb":{"@id":"https:\/\/clickup.com\/blog\/takt-time\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clickup.com\/blog\/takt-time\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/takt-time\/#primaryimage","url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","contentUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","width":1400,"height":1050,"caption":"Takt Time Blog Feature"},{"@type":"BreadcrumbList","@id":"https:\/\/clickup.com\/blog\/takt-time\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clickup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Time Management","item":"https:\/\/clickup.com\/blog\/time-management\/"},{"@type":"ListItem","position":3,"name":"How to Calculate Takt Time to Meet Customer Demand"}]},{"@type":"WebSite","@id":"https:\/\/clickup.com\/blog\/#website","url":"https:\/\/clickup.com\/blog\/","name":"The ClickUp Blog","description":"The ClickUp Blog","publisher":{"@id":"https:\/\/clickup.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clickup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/clickup.com\/blog\/#organization","name":"ClickUp","url":"https:\/\/clickup.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg","contentUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg","width":503,"height":125,"caption":"ClickUp"},"image":{"@id":"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/clickupprojectmanagement","https:\/\/x.com\/clickup","https:\/\/www.linkedin.com\/company\/clickup-app","https:\/\/en.wikipedia.org\/wiki\/ClickUp","https:\/\/tiktok.com\/@clickup","https:\/\/instagram.com\/clickup","https:\/\/www.youtube.com\/@ClickUpProductivity"]},{"@type":"Person","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/f9308b24515b8b65f265dbfac8e00946","name":"PMO Team","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/7cc32635567ff78e2d7dfea37c0f5051c158878c1820337a893b8483802dc579?s=96&d=retro&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7cc32635567ff78e2d7dfea37c0f5051c158878c1820337a893b8483802dc579?s=96&d=retro&r=g","caption":"PMO Team"},"description":"The driving force of the company, this group is responsible for moving the needle across various projects at ClickUp. They double up as storytellers to share project management tips and tricks with the larger community.","url":"https:\/\/clickup.com\/blog\/author\/pmo\/"}]}},"reading":["9"],"keywords":[["Construction","construction",989],["Time Management","time-management",757]],"redirect_params":"","is_translated":"","author_data":{"name":"PMO Team","link":"https:\/\/clickup.com\/blog\/author\/pmo\/","image":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/03\/Screenshot-2024-03-25-at-2.14.52\u202fPM.png","position":""},"category_data":{"name":"Construction","slug":"construction","term_id":989,"url":"https:\/\/clickup.com\/blog\/construction\/"},"hero_data":{"media_url":"","media_alt_text":"","button":"","template_id":"","youtube_thumbnail_url":"","custom_button_text":"","custom_button_url":""},"featured_media_data":{"id":143770,"url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2024\/02\/Takt-Time-Blog-Feature.png","alt":"Takt Time Blog Feature","mime_type":"image\/png","is_webm":false},"_links":{"self":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/143741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/users\/122"}],"replies":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/comments?post=143741"}],"version-history":[{"count":11,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/143741\/revisions"}],"predecessor-version":[{"id":156516,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/143741\/revisions\/156516"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/media\/143770"}],"wp:attachment":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/media?parent=143741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/categories?post=143741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/tags?post=143741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}