{"id":13543,"date":"2020-12-22T00:09:45","date_gmt":"2020-12-22T08:09:45","guid":{"rendered":"https:\/\/clickup.com\/blog\/?p=13543"},"modified":"2025-08-08T04:54:20","modified_gmt":"2025-08-08T11:54:20","slug":"cycle-time-vs-lead-time","status":"publish","type":"post","link":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/","title":{"rendered":"Cycle Time vs Lead Time: Ultimate Guide"},"content":{"rendered":"<p><i><span style=\"font-weight: 400;\">Curious about the differences between <\/span><\/i><i><span style=\"font-weight: 400;\">cycle time and lead time<\/span><\/i><i><span style=\"font-weight: 400;\">?<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">Cycle time and <a href=\"https:\/\/clickup.com\/blog\/?p=14078\">lead time<\/a> are important metrics used in the production process. While <\/span><b>cycle time<\/b><span style=\"font-weight: 400;\"> tells you how long it takes to complete a task, <\/span><b>lead time<\/b><span style=\"font-weight: 400;\"> is the time taken between order placement and fulfillment.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">We know, we know.<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">Those sound like two very confusing and not too <\/span><span style=\"font-weight: 400;\">different times.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But don\u2019t worry.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Distinguishing between them isn\u2019t as tricky as trying to understand the various components of a MasterChef meal.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Rock salt? Kosher salt? Pink salt?<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400;\">What happened to <\/span><\/i><b><i>just<\/i><\/b><i><span style=\"font-weight: 400;\"> salt?!<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">In this article, we\u2019ll cover the different definitions of <\/span><a href=\"#lead\"><span style=\"font-weight: 400;\">lead time vs cycle time<\/span><\/a><span style=\"font-weight: 400;\"> and how to calculate and track each metric effortlessly.\u00a0<\/span><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<div id=\"ub_table-of-contents-9e758e84-005d-46ad-9d6a-c0c746623fb1\" class=\"ub_table-of-contents\" data-hidetext=\"hide\" data-initiallyhideonmobile=\"false\" data-initiallyshow=\"true\" data-scrolltype=\"auto\" data-showtext=\"show\">\n<div class=\"ub_table-of-contents-header-container\">\n<div class=\"ub_table-of-contents-header\">\n<div class=\"ub_table-of-contents-title\">This Article Contains:<\/div>\n<\/div>\n<\/div>\n<div class=\"ub_table-of-contents-extra-container\">\n<div class=\"ub_table-of-contents-container ub_table-of-contents-1-column\">\n<ul>\n<li><a href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#0-what-is-cycle-time-\">What Is Cycle Time?<\/a><\/li>\n<li><a href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#5-what-is-lead-time-\">What Is Lead Time?<\/a><\/li>\n<li><a href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#8-what-is-takt-time-\">What Is Takt Time?<\/a><\/li>\n<li><a href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#11-what-are-the-differences-between-cycle-time-lead-time-and-takt-time-\">What Are the Differences Between Cycle Time, Lead Time, and Takt Time?<\/a><\/li>\n<li><a href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#12-faqs-about-cycle-time-lead-time-and-takt-time-\">FAQs about Cycle Time, Lead Time, and Takt Time<\/a><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<p><span style=\"font-weight: 400;\">Let\u2019s get started. There\u2019s no <\/span><b>time<\/b><span style=\"font-weight: 400;\"> to waste!<\/span><\/p>\n<p><b><i>Note: <\/i><\/b><i><span style=\"font-weight: 400;\">The first few sections are brief explanations of what cycle and lead time are. If you already have a good understanding of both metrics, you can <\/span><\/i><a href=\"#differences\"><i><span style=\"font-weight: 400;\">skip ahead to our comparison section.<\/span><\/i><\/a><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"0-what-is-cycle-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">What Is Cycle Time?<\/span><\/h2>\n<p><b>Cycle <\/b><b>time <\/b><span style=\"font-weight: 400;\">is the time taken to finish one <\/span><span style=\"font-weight: 400;\">process<\/span> <span style=\"font-weight: 400;\">cycle<\/span><span style=\"font-weight: 400;\">, from start to end. And while \u201c<\/span><i><span style=\"font-weight: 400;\">process<\/span><\/i><span style=\"font-weight: 400;\">\u201d usually refers to the <\/span><span style=\"font-weight: 400;\">production process <\/span><span style=\"font-weight: 400;\">in <\/span><span style=\"font-weight: 400;\">manufacturing<\/span><span style=\"font-weight: 400;\">, it can be any repetitive activity too, such as answering <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">calls.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cycle <\/span><span style=\"font-weight: 400;\">time is also defined as the amount of time a team <\/span><i><span style=\"font-weight: 400;\">actually <\/span><\/i><span style=\"font-weight: 400;\">works on a product until it\u2019s ready for <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And since the word <\/span><i><span style=\"font-weight: 400;\">delivery<\/span><\/i><span style=\"font-weight: 400;\"> has got us thinking about pizzas, why not use a pizza<\/span><span style=\"font-weight: 400;\"> order<\/span><span style=\"font-weight: 400;\"> as an example here.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time\u2019s context, \u201c<\/span><span style=\"font-weight: 400;\">order<\/span><span style=\"font-weight: 400;\">\u201d refers to<\/span><span style=\"font-weight: 400;\"> customer order<\/span><span style=\"font-weight: 400;\"> for a product or service.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So for a pizzeria, <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time is the time taken to prepare one delicious pizza.\u00a0<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Just make sure there\u2019s no pineapple on it.<\/span><\/i><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13551\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image6-6.gif\" alt=\"waiter calling for a complicated order\" width=\"400\" height=\"208\" \/><\/figure>\n<\/div>\n<p><b><i>To know the benefits of measuring the <\/i><\/b><b><i>cycle <\/i><\/b><b><i>time <\/i><\/b><b><i>metric<\/i><\/b><b><i>, <a href=\"https:\/\/clickup.com\/blog\/cycle-time-formula\/\">check out our in-depth guide<\/a>.<\/i><\/b><\/p>\n<h3 id=\"1-does-cycle-time-include-wait-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">Does cycle time include wait time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Yes, <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time includes wait time, during which a <\/span><span style=\"font-weight: 400;\">work item<\/span><span style=\"font-weight: 400;\"> is waiting for the next action. For example, the time spent waiting for the oven to heat up initially.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In a nutshell, <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time is the <\/span><b>total<\/b><span style=\"font-weight: 400;\"> time taken to move a <\/span><span style=\"font-weight: 400;\">work item<\/span><span style=\"font-weight: 400;\"> from the start to the end of a <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">or <\/span><a href=\"https:\/\/www.forbes.com\/sites\/forbestechcouncil\/2020\/04\/02\/manufacturing-management-five-ways-to-improve-your-processes\/\"><span style=\"font-weight: 400;\">manufacturing<\/span><\/a><span style=\"font-weight: 400;\"> process<\/span><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h3 id=\"2-how-do-you-calculate-process-cycle-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How do you calculate <\/span><span style=\"font-weight: 400;\">process <\/span><span style=\"font-weight: 400;\">cycle time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Cycle <\/span><span style=\"font-weight: 400;\">time is calculated as the ratio of total <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">time to the number of units produced in that time.\u00a0<\/span><\/p>\n<p><b>Cycle <\/b><b>Time = Total <\/b><b>Production <\/b><b>Time\/Number of Units Produced<\/b><\/p>\n<p><span style=\"font-weight: 400;\">To illustrate this with an example, let\u2019s say that you\u2019re a chef in Gordon Ramsay\u2019s restaurant.\u00a0<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">No pressure at all, right?\u00a0<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">Now let\u2019s suppose that the restaurant works from 10 am to 11 pm and can prepare food for 200 customers per day.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So, <\/span><b>Total <\/b><b>Production <\/b><b>Time<\/b><span style=\"font-weight: 400;\"> = 13 hours.\u00a0\u00a0<\/span><\/p>\n<p><b>Number of Units Produced<\/b><span style=\"font-weight: 400;\"> (meals prepared) = 200 meals.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Then, <\/span><b>Cycle <\/b><b>Time<\/b><span style=\"font-weight: 400;\"> = 13\/200 = 0.065 hours.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So it takes around four minutes to prepare each meal.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Is that enough to satisfy Gordon? Let\u2019s hope so!<\/span><\/i><\/p>\n<p><b><i><a href=\"https:\/\/clickup.com\/blog\/cycle-time-formula\/\">Read more<\/a> about calculating <\/i><\/b><b><i>cycle <\/i><\/b><b><i>time.<\/i><\/b><\/p>\n<h3 id=\"3-how-to-track-cycle-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How to track cycle time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Just use <\/span><a href=\"https:\/\/clickup.com\/\"><span style=\"font-weight: 400;\">ClickUp<\/span><\/a><span style=\"font-weight: 400;\">!\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">ClickUp is the world\u2019s <\/span><a href=\"https:\/\/clickup.com\/reviews\"><span style=\"font-weight: 400;\">#1 project management software<\/span><\/a><span style=\"font-weight: 400;\">.<\/span> <span style=\"font-weight: 400;\">Whether it\u2019s <\/span><a href=\"https:\/\/clickup.com\/resources\/software-teams\/modern-agile-software-development\"><span style=\"font-weight: 400;\">Agile<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/blog\/scrum-project-management\/\"><span style=\"font-weight: 400;\">Scrum<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/blog\/kanban-project-management\/\"><span style=\"font-weight: 400;\">Kanban<\/span><\/a><span style=\"font-weight: 400;\">, or <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/lean-agile\/\"><span style=\"font-weight: 400;\">Lean<\/span><\/a><span style=\"font-weight: 400;\"> manufacturing, ClickUp is the master chef in any project cuisine.\u00a0<\/span><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-18196\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-1400x667.png\" sizes=\"auto, (max-width: 1400px) 100vw, 1400px\" srcset=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-1400x667.png 1400w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-300x143.png 300w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-768x366.png 768w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-1536x732.png 1536w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1-700x333.png 700w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/05\/image9-1.png 1999w\" alt=\"clickup devices 2021\" width=\"1400\" height=\"667\" \/><\/figure>\n<\/div>\n<h4 id=\"4-how-does-clickup-help-track-cycle-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How does ClickUp help track <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time?<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">ClickUp\u2019s powerful <\/span><a href=\"https:\/\/clickup.com\/features\/dashboards\"><span style=\"font-weight: 400;\">Agile <\/span><b>Dashboards<\/b><\/a> <span style=\"font-weight: 400;\">feature lets you calculate <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">turnaround time with the <\/span><a href=\"https:\/\/docs.clickup.com\/en\/articles\/3625877-sprint-widgets\"><b>Cycle <\/b><b>Time widget<\/b><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cycle <\/span><span style=\"font-weight: 400;\">time is measured in two ways:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">ClickUp can automatically start tracking time the instant a <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">enters an <\/span><b>Active <\/b><span style=\"font-weight: 400;\">status group in your Project Space<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Alternatively, ClickUp lets you choose any other status to count as the start of <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time\u00a0<\/span><\/li>\n<\/ul>\n<p><i><span style=\"font-weight: 400;\">\u00a0<\/span><\/i><b><i>Note<\/i><\/b><i><span style=\"font-weight: 400;\">: <\/span><\/i><a href=\"https:\/\/docs.clickup.com\/en\/articles\/1144509-clickapps\"><i><span style=\"font-weight: 400;\">ClickApps<\/span><\/i><\/a><i><span style=\"font-weight: 400;\"> help customize your <\/span><\/i><a href=\"https:\/\/docs.clickup.com\/spaces\/how-to-create-a-space\"><i><span style=\"font-weight: 400;\">ClickUp Workspace<\/span><\/i><\/a><i><span style=\"font-weight: 400;\"> to suit your taste.<\/span><\/i><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13552\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image7-5.png\" sizes=\"auto, (max-width: 801px) 100vw, 801px\" srcset=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image7-5.png 801w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image7-5-300x118.png 300w, https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image7-5-768x303.png 768w\" alt=\"cycle time in clickup\" width=\"801\" height=\"316\" \/><\/figure>\n<\/div>\n<p><span style=\"font-weight: 400;\">But the <\/span><span style=\"font-weight: 400;\">Cycle <\/span><span style=\"font-weight: 400;\">Time graph isn\u2019t the only topping on ClickUp\u2019s Dashboard\u2026 \ud83c\udf55\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For maximum flexibility, you can also choose from <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/burn-up-chart\/\"><span style=\"font-weight: 400;\">Burnup<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/resources\/software-teams\/agile-burndown-charts\"><span style=\"font-weight: 400;\">Burndown<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/cumulative-flow-diagram\/\"><span style=\"font-weight: 400;\">Cumulative Flow Diagram<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/velocity-chart\/\"><span style=\"font-weight: 400;\">Velocity Charts<\/span><\/a><span style=\"font-weight: 400;\">, and more.\u00a0\u00a0<\/span><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"5-what-is-lead-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">What Is Lead Time?<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Usually calculated from the customer\u2019s perspective, <\/span><b><a href=\"https:\/\/clickup.com\/blog\/agile\/lead-time\/\">lead time<\/a><\/b><span style=\"font-weight: 400;\"> is the time spent between receiving the customer order to the final product or service delivery. And just like cycle time, you have different definitions for lead time based on the context.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For example, in <\/span><b>project management<\/b><span style=\"font-weight: 400;\">, the lead time is the time taken to complete a project the moment you receive it from the stakeholder.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, in <\/span><b>supply chain<\/b><b> management<\/b><span style=\"font-weight: 400;\">, it\u2019s the time taken to receive supplies once you place an <\/span><span style=\"font-weight: 400;\">order<\/span><span style=\"font-weight: 400;\">.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And since we\u2019re clearly in a mood for food right now, lead time starts when a waiter takes a <\/span><span style=\"font-weight: 400;\">customer order <\/span><span style=\"font-weight: 400;\">and ends when the <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">receives their dish.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Generally, the lesser the lead time, the better, unless you want to experience <\/span><i><span style=\"font-weight: 400;\">Hell\u2019s Kitchen <\/span><\/i><span style=\"font-weight: 400;\">quite literally.<\/span><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13546\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image1-3.gif\" alt=\"hells kitchen gordon ramsey\" width=\"350\" height=\"200\" \/><\/figure>\n<\/div>\n<p><b><i>Wondering how you can calculate lead time?<\/i><\/b><\/p>\n<p><b><i>Check out our <a href=\"https:\/\/clickup.com\/blog\/agile\/lead-time-formula\/\">lead time formula guide<\/a>.<\/i><\/b><\/p>\n<h3 id=\"6-how-to-calculate-lead-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How to calculate lead time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">To calculate lead time, you need to know the delivery date\/time and the order\u2019s request date\/time.\u00a0<\/span><\/p>\n<p><b>Lead Time = <\/b><b>Order <\/b><b>Delivery Time (end date) \u2013 <\/b><b>Order <\/b><b>Received Time (request date)<\/b><\/p>\n<p><span style=\"font-weight: 400;\">For example, let\u2019s say a <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">orders pasta at 1:30 pm and receives it at 2 pm.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Then the lead time is 30 minutes.\u00a0<\/span><\/p>\n<p><b><i>Read more about calculating the lead time <\/i><\/b><b><i>metric <\/i><\/b><b><i>here.<\/i><\/b><\/p>\n<h3 id=\"7-how-to-track-lead-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How to track lead time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">While you could use stopwatches or kitchen timers to track lead time, that\u2019s just a lot of <\/span><b>manual <\/b><span style=\"font-weight: 400;\">work<\/span><span style=\"font-weight: 400;\">.<\/span><i><span style=\"font-weight: 400;\">\u00a0<\/span><\/i><\/p>\n<p><i><span style=\"font-weight: 400;\">Not ideal when you have strict deadlines to meet or hungry customers waiting, right?<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">Instead, use the <\/span><a href=\"https:\/\/docs.clickup.com\/en\/articles\/3625877-sprint-widgets\"><b>Lead Time Widget<\/b><\/a><span style=\"font-weight: 400;\"> on ClickUp\u2019s Dashboards! It\u2019ll <\/span><b>automatically <\/b><span style=\"font-weight: 400;\">track how long it takes on average to finish a <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">from the moment it\u2019s created.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">You can customize the:<\/span><\/p>\n<ul>\n<li><b>Time range<\/b><span style=\"font-weight: 400;\">: set the required time range and the frequency of the graph<\/span><\/li>\n<li><b>Sample time<\/b><span style=\"font-weight: 400;\">: choose how many days you want to include in the average for each point in the graph<\/span><\/li>\n<li><b>Status group counted as completion<\/b><span style=\"font-weight: 400;\">: select the status group, like Closed or Done, to indicate <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">completion<\/span><\/li>\n<\/ul>\n<p><b><i>Note<\/i><\/b><i><span style=\"font-weight: 400;\">: The same customizations can be applied to ClickUp\u2019s <\/span><\/i><i><span style=\"font-weight: 400;\">Cycle <\/span><\/i><i><span style=\"font-weight: 400;\">Time widget too.\u00a0<\/span><\/i><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13550\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image5-4.gif\" alt=\"lead time in clickup\" width=\"960\" height=\"498\" \/><\/figure>\n<\/div>\n<p><i><span style=\"font-weight: 400;\">Still confused about <\/span><\/i><i><span style=\"font-weight: 400;\">lead time vs cycle time<\/span><\/i><i><span style=\"font-weight: 400;\">?\u00a0<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">Don\u2019t worry! We\u2019ve summarized the differences in a handy chart <\/span><a href=\"#differences\"><span style=\"font-weight: 400;\">later on in this article<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, before we get there, you need to understand that lead time and <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time aren\u2019t the <\/span><b>only<\/b> <a href=\"https:\/\/clickup.com\/blog\/lean-principles-software-development\/\"><span style=\"font-weight: 400;\">Lean<\/span><\/a><span style=\"font-weight: 400;\"> metrics<\/span><span style=\"font-weight: 400;\"> or <\/span><a href=\"https:\/\/clickup.com\/blog\/scrum-vs-kanban\/\"><span style=\"font-weight: 400;\">Kanban<\/span><\/a><span style=\"font-weight: 400;\"> metrics<\/span><span style=\"font-weight: 400;\"> used by project managers.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">You also have Takt time, their German cousin (<\/span><i><span style=\"font-weight: 400;\">\u201ctakt\u201d is the German word for pulse or rhythm<\/span><\/i><span style=\"font-weight: 400;\">).\u00a0<\/span><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"8-what-is-takt-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">What Is Takt Time?<\/span><\/h2>\n<p><b>Takt time<\/b><span style=\"font-weight: 400;\"> is the <\/span><b>rate<\/b><span style=\"font-weight: 400;\"> at which you should <\/span><span style=\"font-weight: 400;\">work <\/span><span style=\"font-weight: 400;\">to complete the <\/span><span style=\"font-weight: 400;\">production process <\/span><span style=\"font-weight: 400;\">to meet <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">demands on time.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Measuring takt time helps you:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Adjust <\/span><a href=\"https:\/\/clickup.com\/blog\/workflow-management\/\"><span style=\"font-weight: 400;\">workflow<\/span><\/a> <span style=\"font-weight: 400;\">throughput <\/span><span style=\"font-weight: 400;\">based on <\/span><span style=\"font-weight: 400;\">customer demand<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Improve the <\/span><span style=\"font-weight: 400;\">entire <\/span><span style=\"font-weight: 400;\">value stream<\/span> <a href=\"https:\/\/www.forbes.com\/sites\/forbesagencycouncil\/2020\/04\/07\/how-to-maintain-efficiency-in-times-of-unexpected-changes\/\"><span style=\"font-weight: 400;\">efficiency<\/span><\/a><span style=\"font-weight: 400;\"> for a specific <\/span><span style=\"font-weight: 400;\">batch size<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Avoid raw material <a href=\"https:\/\/clickup.com\/blog\/inventory-templates\/\">shortages and excess inventory<\/a><\/span><\/li>\n<li><span style=\"font-weight: 400;\">Boost <\/span><span style=\"font-weight: 400;\">customer satisfaction<\/span><span style=\"font-weight: 400;\"> with timely delivery<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">For example, if you know your restaurant\u2019s takt time, you can optimize the kitchen <\/span><span style=\"font-weight: 400;\">workflow <\/span><span style=\"font-weight: 400;\">to serve food to customers on time, helping you avoid such <\/span><i><span style=\"font-weight: 400;\">hangry<\/span><\/i><span style=\"font-weight: 400;\"> customers:<\/span><\/p>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-13549\" src=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/image4-6.gif\" alt=\"table flip\" width=\"350\" height=\"200\" \/><\/figure>\n<\/div>\n<h3 id=\"9-how-to-calculate-takt-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How to calculate takt time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Takt time is calculated as the ratio of your total <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">time to the number of units required by the <\/span><span style=\"font-weight: 400;\">customer<\/span><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><b>Takt Time = Total <\/b><b>Production <\/b><b>Time\/Number of Units Required (<\/b><b>customer demand<\/b><b>)<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Let\u2019s take Gordon Ramsay\u2019s example <\/span><a href=\"#cycle\"><span style=\"font-weight: 400;\">we discussed earlier<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time is four minutes to prepare a dish, which <\/span><i><span style=\"font-weight: 400;\">should<\/span><\/i><span style=\"font-weight: 400;\"> be okay under normal circumstances.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But it\u2019s the weekend, and Gordon expects rush hour.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">He wants the staff to serve 300 customers in 13 hours.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Then, takt time = 13\/300 = 0.04 hours, which is roughly two minutes per meal.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So if you\u2019ve to meet the <\/span><span style=\"font-weight: 400;\">demand<\/span><span style=\"font-weight: 400;\">, you\u2019ll have to reduce the <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time from four to two minutes.<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Good luck serving up a filet mignon that quickly!\u00a0<\/span><\/i><\/p>\n<p><b><i>Read more about takt time.<\/i><\/b><\/p>\n<h4 id=\"10-how-does-clickup-help-here-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">How does ClickUp help here?<\/span><\/h4>\n<p><span style=\"font-weight: 400;\">ClickUp\u2019s Cycle and Lead Time widgets aren\u2019t the only features for <a href=\"https:\/\/clickup.com\/blog\/operations-management-software\/\">operations management<\/a>.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">With the flexibility that even puts the most versatile ingredients in the kitchen to shame, ClickUp offers a wide variety of features like:<\/span><\/p>\n<ul>\n<li><a href=\"https:\/\/clickup.com\/features\/project-time-tracking\"><b>Native Time Tracking<\/b><\/a><span style=\"font-weight: 400;\">: track how long your tasks take right inside ClickUp<\/span><\/li>\n<li><a href=\"https:\/\/clickup.com\/features\/dates-and-times\"><b>Due Dates<\/b><\/a><span style=\"font-weight: 400;\">: create <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">deadlines and get auto-notified when deadlines are overshot\u00a0<\/span><\/li>\n<li><a href=\"https:\/\/clickup.com\/features\/time-estimates\"><b>Time Estimates<\/b><\/a><span style=\"font-weight: 400;\">: set accurate timeframes for your <\/span><a href=\"https:\/\/clickup.com\/blog\/?p=8576\"><span style=\"font-weight: 400;\">remote<\/span><\/a><span style=\"font-weight: 400;\"> or in-house team<\/span><\/li>\n<li><a href=\"https:\/\/help.clickup.com\/hc\/en-us\/articles\/6310399909143-Add-a-Timeline-view-beta\"><b>Timeline View<\/b><\/a><span style=\"font-weight: 400;\">: visualize your <a href=\"https:\/\/clickup.com\/blog\/production-scheduling-software\/\">production schedule<\/a> over days, weeks, and months<\/span><\/li>\n<li><a href=\"https:\/\/docs.clickup.com\/en\/articles\/4193271-workload-view-resource-management-clickapp\"><b>Workload View<\/b><\/a><span style=\"font-weight: 400;\">: monitor your team\u2019s capacity for efficient <\/span><a href=\"https:\/\/clickup.com\/blog\/resource-management\/\"><span style=\"font-weight: 400;\">resource management<\/span><\/a><\/li>\n<li><a href=\"https:\/\/help.clickup.com\/hc\/en-us\/articles\/6304488850967-Pulse-overview\"><b>Pulse<\/b><\/a><span style=\"font-weight: 400;\">: analyze your in-house or <\/span><a href=\"https:\/\/clickup.com\/blog\/?p=8883\"><span style=\"font-weight: 400;\">virtual team<\/span><\/a><span style=\"font-weight: 400;\">\u2019s <\/span><i><span style=\"font-weight: 400;\">takt <\/span><\/i><span style=\"font-weight: 400;\">over a day<\/span><\/li>\n<li><a href=\"https:\/\/docs.clickup.com\/en\/articles\/4388088-work-in-progress-limits-clickapp\"><b>WIP Limit<\/b><\/a><span style=\"font-weight: 400;\">: set <\/span><span style=\"font-weight: 400;\">Work <\/span><span style=\"font-weight: 400;\">In Progress (WIP) limits to indicate when there\u2019s too much <\/span><span style=\"font-weight: 400;\">work <\/span><span style=\"font-weight: 400;\">under a specific status<\/span><\/li>\n<li><a href=\"https:\/\/clickup.com\/integrations\"><b>Time Tracking Integrations<\/b><\/a><span style=\"font-weight: 400;\">: ClickUp integrates with several time tracking tools like <\/span><a href=\"https:\/\/clickup.com\/integrations\/toggl\"><span style=\"font-weight: 400;\">Toggl<\/span><\/a><span style=\"font-weight: 400;\">, <\/span><a href=\"https:\/\/clickup.com\/integrations\/harvest\"><span style=\"font-weight: 400;\">Harvest<\/span><\/a><span style=\"font-weight: 400;\">, and <\/span><a href=\"https:\/\/clickup.com\/integrations\/everhour\"><span style=\"font-weight: 400;\">Everhour<\/span><\/a><span style=\"font-weight: 400;\"> to help you track <\/span><span style=\"font-weight: 400;\">task <\/span><span style=\"font-weight: 400;\">time with ease<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Check out all of ClickUp\u2019s powerful features <\/span><a href=\"https:\/\/clickup.com\/features\"><span style=\"font-weight: 400;\">here<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"11-what-are-the-differences-between-cycle-time-lead-time-and-takt-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">What Are the Differences Between Cycle Time, Lead Time, and Takt Time?<\/span><\/h2>\n<p><i><span style=\"font-weight: 400;\">Understanding how <\/span><\/i><i><span style=\"font-weight: 400;\">cycle <\/span><\/i><i><span style=\"font-weight: 400;\">time, lead time, and takt time are different isn\u2019t as difficult as identifying dishes in MasterChef\u2019s Blind Taste Test challenge.<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">If you\u2019re still confused about it, don\u2019t worry!<\/span><\/p>\n<p><span style=\"font-weight: 400;\">We\u2019ve summarized the key differences between<\/span><span style=\"font-weight: 400;\"> lead time vs cycle time<\/span><span style=\"font-weight: 400;\"> vs takt time in this handy chart:<\/span><\/p>\n<figure class=\"wp-block-table\">\n<table>\n<tbody>\n<tr>\n<td><\/td>\n<td><b>Cycle <\/b><b>Time<\/b><\/td>\n<td><b>Lead Time\u00a0<\/b><\/td>\n<td><b>Takt Time<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>What it helps with<\/b><\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Helps estimate the <\/span><span style=\"font-weight: 400;\">production rate <\/span><span style=\"font-weight: 400;\">\u00a0<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Helps predict client or <\/span><span style=\"font-weight: 400;\">customer <\/span><span style=\"font-weight: 400;\">wait time<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Calculates the rate at which you should <\/span><span style=\"font-weight: 400;\">work <\/span><span style=\"font-weight: 400;\">to meet <\/span><span style=\"font-weight: 400;\">demand<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><b>What it considers<\/b><\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Only considers the actual <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">time\u00a0<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Considers the whole <\/span><span style=\"font-weight: 400;\">production process<\/span><span style=\"font-weight: 400;\">, from receiving orders to sales processing<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Focuses on the maximum time a team should spend on delivering a <\/span><span style=\"font-weight: 400;\">work item<\/span><span style=\"font-weight: 400;\">\u00a0<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><b>How businesses use it\u00a0<\/b><\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Businesses should aim for shorter <\/span><span style=\"font-weight: 400;\">operation<\/span> <span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">times to cater to greater demands<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">For better <\/span><span style=\"font-weight: 400;\">customer satisfaction<\/span><span style=\"font-weight: 400;\">, <\/span><span style=\"font-weight: 400;\">lead times<\/span><span style=\"font-weight: 400;\"> should be low<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Takt times can be compared with <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time to understand <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">capabilities<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td><b>Formula<\/b><\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Cycle <\/span><span style=\"font-weight: 400;\">Time = Total <\/span><span style=\"font-weight: 400;\">Production <\/span><span style=\"font-weight: 400;\">Time\/ Number of Units Produced<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Lead Time = Delivery Date \u2013 <\/span><span style=\"font-weight: 400;\">Order <\/span><span style=\"font-weight: 400;\">Received Date<\/span><\/li>\n<\/ul>\n<\/td>\n<td>\n<ul>\n<li style=\"font-weight: 400;\"><span style=\"font-weight: 400;\">Takt Time = Total <\/span><span style=\"font-weight: 400;\">Production <\/span><span style=\"font-weight: 400;\">Time\/ <\/span><span style=\"font-weight: 400;\">Customer Demand<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"12-faqs-about-cycle-time-lead-time-and-takt-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">FAQs about Cycle Time, Lead Time, and Takt Time<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Dabble in <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time or lead time, and you\u2019ll probably come across terms like <\/span><span style=\"font-weight: 400;\">throughput<\/span><span style=\"font-weight: 400;\">, <\/span><span style=\"font-weight: 400;\">value stream<\/span><span style=\"font-weight: 400;\">, and more.\u00a0<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Now, what are they?<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">No worries, here\u2019s a quick Masterclass to clear your doubts:<\/span><\/p>\n<h3 id=\"13-1-what-is-the-difference-between-manufacturing-lead-time-amp-throughput-rate-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">1. <\/span><span style=\"font-weight: 400;\">What is the difference between <\/span><span style=\"font-weight: 400;\">manufacturing <\/span><span style=\"font-weight: 400;\">lead time &amp; <\/span><span style=\"font-weight: 400;\">throughput rate<\/span><span style=\"font-weight: 400;\">?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">From the <\/span><span style=\"font-weight: 400;\">customer\u2019s perspective<\/span><span style=\"font-weight: 400;\">, <\/span><b>manufacturing <\/b><b>lead time<\/b><span style=\"font-weight: 400;\"> is the time between placing an <\/span><span style=\"font-weight: 400;\">order <\/span><span style=\"font-weight: 400;\">and receiving it.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">On the other hand, <\/span><b>throughput rate<\/b> <span style=\"font-weight: 400;\">is considered from the <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">perspective and measures the rate at which <\/span><span style=\"font-weight: 400;\">raw material<\/span><span style=\"font-weight: 400;\"> or a <\/span><span style=\"font-weight: 400;\">manufacturing unit <\/span><span style=\"font-weight: 400;\">passes through the <\/span><span style=\"font-weight: 400;\">process<\/span><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<h3 id=\"14-2-what-is-value-stream-mapping-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">2.<\/span><span style=\"font-weight: 400;\"> What is <\/span><span style=\"font-weight: 400;\">value stream mapping<\/span><span style=\"font-weight: 400;\">?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">In <\/span><span style=\"font-weight: 400;\">Lean manufacturing<\/span><span style=\"font-weight: 400;\">, a <\/span><b>value stream<\/b><span style=\"font-weight: 400;\"> is a sequence of value-adding activities that create an overall product or result for customers or stakeholders.\u00a0<\/span><\/p>\n<p><b>Value stream mapping<\/b><span style=\"font-weight: 400;\"> is a method where you visualize all the essential steps in your <\/span><span style=\"font-weight: 400;\">value stream<\/span><span style=\"font-weight: 400;\"> using a flowchart. The chart (known as a <\/span><b>value stream map<\/b><span style=\"font-weight: 400;\">) helps you identify and reduce\/remove unnecessary steps in the<\/span><span style=\"font-weight: 400;\"> value stream<\/span><span style=\"font-weight: 400;\">, making it more efficient.<\/span><\/p>\n<h3 id=\"15-3-what-factors-negatively-affect-lead-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">3.<\/span><span style=\"font-weight: 400;\"> What factors negatively affect lead time?<\/span><\/h3>\n<p><b>Five <\/b><span style=\"font-weight: 400;\">key factors negatively affecting <\/span><span style=\"font-weight: 400;\">lead times<\/span><span style=\"font-weight: 400;\"> are:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">An unnecessary <\/span><span style=\"font-weight: 400;\">process step <\/span><span style=\"font-weight: 400;\">in the <\/span><span style=\"font-weight: 400;\">production<\/span> <span style=\"font-weight: 400;\">flow<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Inefficient <\/span><span style=\"font-weight: 400;\">inventory <\/span><span style=\"font-weight: 400;\">management<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Inventory <\/span><span style=\"font-weight: 400;\">stock-outs that could cause a <\/span><span style=\"font-weight: 400;\">production<\/span> <span style=\"font-weight: 400;\">bottleneck<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Varying <\/span><span style=\"font-weight: 400;\">lead times<\/span><span style=\"font-weight: 400;\"> between your different vendors\/suppliers<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Unpredictable events like sudden <\/span><span style=\"font-weight: 400;\">raw material <\/span><span style=\"font-weight: 400;\">unavailability\u00a0<\/span><\/li>\n<\/ul>\n<h3 id=\"16-4-how-can-you-reduce-your-cycle-time-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">4.<\/span><span style=\"font-weight: 400;\"> How can you reduce your cycle time?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Reducing <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time not only improves <\/span><span style=\"font-weight: 400;\">customer satisfaction<\/span><span style=\"font-weight: 400;\">, but it\u2019ll also boost your team\u2019s productivity.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">So here are some ways you can reduce your <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time:<\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">Define each <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/agile-story-points\/\"><span style=\"font-weight: 400;\">user story<\/span><\/a><span style=\"font-weight: 400;\"> and goal clearly<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Encourage teams to be self-sufficient, take responsibility, and work with minimal feedback<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Use the <\/span><span style=\"font-weight: 400;\">WIP limit<\/span><span style=\"font-weight: 400;\"> method to eliminate multitasking<\/span><\/li>\n<li><a href=\"https:\/\/clickup.com\/blog\/automate-workflows\/\"><span style=\"font-weight: 400;\">Automate repetitive manual <\/span><span style=\"font-weight: 400;\">work<\/span><\/a><\/li>\n<li><span style=\"font-weight: 400;\">Adopt an Agile-based approach like <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/agile-scrum\/\"><span style=\"font-weight: 400;\">Scrum<\/span><\/a><\/li>\n<li><span style=\"font-weight: 400;\">Use project management tools like ClickUp to manage processes with ease!<\/span><\/li>\n<\/ul>\n<h3 id=\"17-5-what-is-the-main-goal-of-agile-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">5. <\/span><span style=\"font-weight: 400;\">What is the main goal of <\/span><span style=\"font-weight: 400;\">Agile<\/span><span style=\"font-weight: 400;\">?<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The <\/span><a href=\"https:\/\/clickup.com\/blog\/agile\/agile-workflow\/\"><span style=\"font-weight: 400;\">Agile <\/span><\/a><span style=\"font-weight: 400;\">methodology\u2019s main goal is to help teams build and deliver superior quality products in the shortest time possible. For this, <a href=\"https:\/\/clickup.com\/blog\/agile\/agile-metrics\/\">Agile metrics<\/a> (like cycle time and lead time) and tools (like <\/span><a href=\"https:\/\/clickup.com\/blog\/sprint-backlog\/\"><span style=\"font-weight: 400;\">sprint backlog<\/span><\/a><span style=\"font-weight: 400;\">) aid process improvement.<\/span><\/p>\n<p><a href=\"https:\/\/clickup.com\/blog\/what-is-agile-project-management\/\"><b><i>Read more about Agile project management.<\/i><\/b><\/a><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n<h2 id=\"18-conclusion-\" class=\"wp-block-heading\"><span style=\"font-weight: 400;\">Conclusion<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">In the kitchen, <\/span><b>knowing<\/b><span style=\"font-weight: 400;\"> how you\u2019ll tackle a recipe (from prep to garnish) not only prevents cooking disasters, but it\u2019ll also make the <\/span><span style=\"font-weight: 400;\">entire process<\/span><span style=\"font-weight: 400;\"> more efficient.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And that\u2019s where <\/span><span style=\"font-weight: 400;\">different times<\/span><span style=\"font-weight: 400;\"> like <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time, lead time, and takt time come into play.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Understanding and tracking each <\/span><span style=\"font-weight: 400;\">metric <\/span><span style=\"font-weight: 400;\">is crucial for streamlining any <\/span><span style=\"font-weight: 400;\">production <\/span><span style=\"font-weight: 400;\">or <\/span><span style=\"font-weight: 400;\">manufacturing process<\/span><span style=\"font-weight: 400;\">, be it s<\/span><span style=\"font-weight: 400;\">oftware delivery<\/span><span style=\"font-weight: 400;\"> or satisfying hungry customers on time.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, using stopwatches to time each <\/span><span style=\"font-weight: 400;\">operation <\/span><span style=\"font-weight: 400;\">is anything but efficient.\u00a0<\/span><\/p>\n<p><i><span style=\"font-weight: 400;\">Instead, just use Clickup!<\/span><\/i><\/p>\n<p><span style=\"font-weight: 400;\">From accurately tracking <\/span><span style=\"font-weight: 400;\">cycle <\/span><span style=\"font-weight: 400;\">time and lead time to <\/span><a href=\"https:\/\/clickup.com\/blog\/virtual-project-management\/\"><span style=\"font-weight: 400;\">managing remote projects<\/span><\/a><span style=\"font-weight: 400;\">, ClickUp can help you every step of the way.<\/span><\/p>\n<p><a href=\"https:\/\/clickup.com\/\"><span style=\"font-weight: 400;\">Get ClickUp for free<\/span><\/a><span style=\"font-weight: 400;\"> to start <\/span><i><span style=\"font-weight: 400;\">tasting <\/span><\/i><span style=\"font-weight: 400;\">project success today!<\/span><\/p>\n<div class=\"wp-block-spacer\" style=\"height: 50px;\" aria-hidden=\"true\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Curious about the differences between cycle time and lead time? Cycle time and lead time are important metrics used in the production process. While cycle time tells you how long it takes to complete a task, lead time is the time taken between order placement and fulfillment. We know, we know. Those sound like two [&hellip;]<\/p>\n","protected":false},"author":29,"featured_media":13545,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ub_ctt_via":"","cu_sticky_sidebar_cta_is_visible":true,"cu_sticky_sidebar_cta_title":"Start using ClickUp today","cu_sticky_sidebar_cta_bullet_1":"Manage all your work in one place","cu_sticky_sidebar_cta_bullet_2":"Collaborate with your team","cu_sticky_sidebar_cta_bullet_3":"Use ClickUp for FREE\u2014forever","cu_sticky_sidebar_cta_button_text":"Get Started","cu_sticky_sidebar_cta_button_link":"","_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[766,757],"tags":[600,601],"class_list":["post-13543","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-manage","category-time-management","tag-cycle-time-vs-lead-time","tag-lead-time-vs-cycle-time"],"featured_image_src":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","author_info":{"display_name":"Erica Chappell","author_link":"https:\/\/clickup.com\/blog\/author\/erica\/"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Cycle Time vs Lead Time: Ultimate Guide | ClickUp<\/title>\n<meta name=\"description\" content=\"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cycle Time vs Lead Time: Ultimate Guide | ClickUp\" \/>\n<meta property=\"og:description\" content=\"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0\" \/>\n<meta property=\"og:url\" content=\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\" \/>\n<meta property=\"og:site_name\" content=\"ClickUp\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/clickupprojectmanagement\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-22T08:09:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-08T11:54:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1400\" \/>\n\t<meta property=\"og:image:height\" content=\"1050\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Erica Chappell\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@clickup\" \/>\n<meta name=\"twitter:site\" content=\"@clickup\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erica Chappell\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\"},\"author\":{\"name\":\"Erica Chappell\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/f23870104d275432347a45a5d58cd995\"},\"headline\":\"Cycle Time vs Lead Time: Ultimate Guide\",\"datePublished\":\"2020-12-22T08:09:45+00:00\",\"dateModified\":\"2025-08-08T11:54:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\"},\"wordCount\":2147,\"publisher\":{\"@id\":\"https:\/\/clickup.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png\",\"keywords\":[\"cycle time vs lead time\",\"lead time vs cycle time\"],\"articleSection\":[\"Manage\",\"Time Management\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\",\"url\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\",\"name\":\"Cycle Time vs Lead Time: Ultimate Guide | ClickUp\",\"isPartOf\":{\"@id\":\"https:\/\/clickup.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png\",\"datePublished\":\"2020-12-22T08:09:45+00:00\",\"dateModified\":\"2025-08-08T11:54:20+00:00\",\"description\":\"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0\",\"breadcrumb\":{\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage\",\"url\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png\",\"contentUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png\",\"width\":1400,\"height\":1050},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/clickup.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Manage\",\"item\":\"https:\/\/clickup.com\/blog\/manage\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cycle Time vs Lead Time: Ultimate Guide\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/clickup.com\/blog\/#website\",\"url\":\"https:\/\/clickup.com\/blog\/\",\"name\":\"ClickUp\",\"description\":\"The ClickUp Blog\",\"publisher\":{\"@id\":\"https:\/\/clickup.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/clickup.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/clickup.com\/blog\/#organization\",\"name\":\"ClickUp\",\"url\":\"https:\/\/clickup.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg\",\"contentUrl\":\"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg\",\"width\":503,\"height\":125,\"caption\":\"ClickUp\"},\"image\":{\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/clickupprojectmanagement\",\"https:\/\/x.com\/clickup\",\"https:\/\/www.linkedin.com\/company\/clickup-app\",\"https:\/\/en.wikipedia.org\/wiki\/ClickUp\",\"https:\/\/tiktok.com\/@clickup\",\"https:\/\/instagram.com\/clickup\",\"https:\/\/www.youtube.com\/@ClickUpProductivity\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/f23870104d275432347a45a5d58cd995\",\"name\":\"Erica Chappell\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/clickup.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/111cd55690e399c4b6d904d07b9c35ebce3aa4af5edb3c2efcdadf05c88efe71?s=96&d=retro&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/111cd55690e399c4b6d904d07b9c35ebce3aa4af5edb3c2efcdadf05c88efe71?s=96&d=retro&r=g\",\"caption\":\"Erica Chappell\"},\"description\":\"Erica is ClickUp's Managing Editor and professional beach bum. She spends her days creating emails, blogs, and landing pages to help people learn how to increase their productivity so they can do more of what they love.\",\"sameAs\":[\"https:\/\/www.linkedin.com\/in\/chappellerica\/\"],\"url\":\"https:\/\/clickup.com\/blog\/author\/erica\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cycle Time vs Lead Time: Ultimate Guide | ClickUp","description":"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/","og_locale":"en_US","og_type":"article","og_title":"Cycle Time vs Lead Time: Ultimate Guide | ClickUp","og_description":"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0","og_url":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/","og_site_name":"ClickUp","article_publisher":"https:\/\/www.facebook.com\/clickupprojectmanagement","article_published_time":"2020-12-22T08:09:45+00:00","article_modified_time":"2025-08-08T11:54:20+00:00","og_image":[{"width":1400,"height":1050,"url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","type":"image\/png"}],"author":"Erica Chappell","twitter_card":"summary_large_image","twitter_creator":"@clickup","twitter_site":"@clickup","twitter_misc":{"Written by":"Erica Chappell","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#article","isPartOf":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/"},"author":{"name":"Erica Chappell","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/f23870104d275432347a45a5d58cd995"},"headline":"Cycle Time vs Lead Time: Ultimate Guide","datePublished":"2020-12-22T08:09:45+00:00","dateModified":"2025-08-08T11:54:20+00:00","mainEntityOfPage":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/"},"wordCount":2147,"publisher":{"@id":"https:\/\/clickup.com\/blog\/#organization"},"image":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage"},"thumbnailUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","keywords":["cycle time vs lead time","lead time vs cycle time"],"articleSection":["Manage","Time Management"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/","url":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/","name":"Cycle Time vs Lead Time: Ultimate Guide | ClickUp","isPartOf":{"@id":"https:\/\/clickup.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage"},"image":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage"},"thumbnailUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","datePublished":"2020-12-22T08:09:45+00:00","dateModified":"2025-08-08T11:54:20+00:00","description":"Confused about cycle time vs lead time? This article highlights what they are, how to calculate them, and how they\u2019re different.\u00a0","breadcrumb":{"@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#primaryimage","url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","contentUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2020\/12\/cycle-time-vs-lead-time.png","width":1400,"height":1050},{"@type":"BreadcrumbList","@id":"https:\/\/clickup.com\/blog\/cycle-time-vs-lead-time\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/clickup.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Manage","item":"https:\/\/clickup.com\/blog\/manage\/"},{"@type":"ListItem","position":3,"name":"Cycle Time vs Lead Time: Ultimate Guide"}]},{"@type":"WebSite","@id":"https:\/\/clickup.com\/blog\/#website","url":"https:\/\/clickup.com\/blog\/","name":"ClickUp","description":"The ClickUp Blog","publisher":{"@id":"https:\/\/clickup.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/clickup.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/clickup.com\/blog\/#organization","name":"ClickUp","url":"https:\/\/clickup.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg","contentUrl":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2025\/07\/logo-v3-clickup-light.jpg","width":503,"height":125,"caption":"ClickUp"},"image":{"@id":"https:\/\/clickup.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/clickupprojectmanagement","https:\/\/x.com\/clickup","https:\/\/www.linkedin.com\/company\/clickup-app","https:\/\/en.wikipedia.org\/wiki\/ClickUp","https:\/\/tiktok.com\/@clickup","https:\/\/instagram.com\/clickup","https:\/\/www.youtube.com\/@ClickUpProductivity"]},{"@type":"Person","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/f23870104d275432347a45a5d58cd995","name":"Erica Chappell","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/clickup.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/111cd55690e399c4b6d904d07b9c35ebce3aa4af5edb3c2efcdadf05c88efe71?s=96&d=retro&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/111cd55690e399c4b6d904d07b9c35ebce3aa4af5edb3c2efcdadf05c88efe71?s=96&d=retro&r=g","caption":"Erica Chappell"},"description":"Erica is ClickUp's Managing Editor and professional beach bum. She spends her days creating emails, blogs, and landing pages to help people learn how to increase their productivity so they can do more of what they love.","sameAs":["https:\/\/www.linkedin.com\/in\/chappellerica\/"],"url":"https:\/\/clickup.com\/blog\/author\/erica\/"}]}},"reading":["9"],"keywords":[["Manage","manage",766],["Time Management","time-management",757]],"redirect_params":{"product":"","department":""},"is_translated":"true","author_data":{"name":"Erica Chappell","link":"https:\/\/clickup.com\/blog\/author\/erica\/","image":"https:\/\/clickup.com\/blog\/wp-content\/uploads\/2021\/07\/T093XFN5U-UP614U630-ea06b40d276f-512.jpg","position":"Managing Editor"},"category_data":{"name":"Manage","slug":"manage","term_id":766,"url":"https:\/\/clickup.com\/blog\/manage\/"},"hero_data":{"media_url":"","media_alt_text":"Cycle Time vs Lead Time: Ultimate Guide","button":"","template_id":"","youtube_thumbnail_url":"","custom_button_text":"","custom_button_url":""},"_links":{"self":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/13543","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/comments?post=13543"}],"version-history":[{"count":14,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/13543\/revisions"}],"predecessor-version":[{"id":509783,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/posts\/13543\/revisions\/509783"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/media\/13545"}],"wp:attachment":[{"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/media?parent=13543"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/categories?post=13543"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/clickup.com\/blog\/wp-json\/wp\/v2\/tags?post=13543"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}